
Two maintenance proposals can use the same annual price label while covering very different equipment, tasks, consumables and response terms. Compare the written scope line by line and connect every task to an equipment inventory.
In short
A commercial HVAC maintenance agreement should list covered assets, planned tasks, visit frequency, filters and other consumables, reporting, repair authorization, exclusions, emergency-response terms, price and renewal conditions. It should not imply that every failure or part is included unless the contract says so.
Start with the equipment schedule
List each rooftop unit, furnace, boiler, pump, split system, make-up air unit, exhaust fan and control system covered. Use asset numbers and locations. If the proposal says “all HVAC equipment” without a schedule, both parties may hold different expectations.
Patterson Mechanical offers commercial HVAC maintenance programs within its Manitoba service area. The actual inclusions and response terms belong in the property-specific proposal.
| Agreement item | What to confirm | Common ambiguity |
|---|---|---|
| Asset coverage | Unit numbers, types and locations | Ancillary fans, controls or pumps omitted |
| Tasks | Inspect, clean, test, measure or replace | “Tune-up” without a task list |
| Consumables | Filter, belt and chemical inclusion | Material billed separately |
| Repairs | Authorization and quote process | Inspection mistaken for repair coverage |
| Response | Hours, priority, availability and rates | Priority mistaken for guaranteed arrival |
| Reporting | Readings, findings, photos and asset history | Invoice used as the only record |
Define preventive tasks versus observation
“Check” can mean a visual observation or a measured test. The agreement should distinguish filter replacement, coil cleaning, belt work, drainage service, combustion analysis, safety testing, refrigeration measurements, damper operation and control review. Required tasks vary by equipment and manufacturer.
Use the existing commercial HVAC preventive-maintenance checklist to identify building-level needs before comparing contracts.
Match frequency to the equipment and building
Seasonal heating and cooling visits are a common framework, but high runtime, dust, kitchen use, critical spaces or special equipment can justify more frequent work. The proposal should explain which assets are serviced on each visit rather than dividing the annual price without a schedule.
Clarify filters, belts, chemicals and parts
Confirm which sizes and quantities are included, who maintains inventory, and how upgrades or unusual materials are billed. A fixed agreement may include selected consumables while repairs and major parts remain separate.
Write the repair-authorization process
Set the contact and approval threshold for corrective work. Define whether technicians may complete minor repairs during a scheduled visit and when a separate quote is required. Document temporary repairs and assign a completion plan.
Read emergency-response language carefully
Priority service, after-hours availability and guaranteed response are different commitments. Confirm hours, contact method, rates, excluded conditions and whether agreement status changes queue priority. Do not rely on a sales summary that is absent from the contract.
Require useful records
A service report should identify the asset, work performed, measurements where relevant, deficiencies, photos when useful and recommended timing. Trend repeated faults and unresolved items. This history supports the repair-versus-replacement decision and capital plan.
Use a proposal scorecard
- Are all assets listed?
- Are tasks and frequencies explicit?
- Are consumables, repairs and exclusions clear?
- Are response terms defined without vague guarantees?
- Will reports support future budgeting?
- Are term, renewal, cancellation and price changes stated?
Download the agreement scorecard
Score up to three proposals against the same asset, task, response, reporting and contract criteria.
Manitoba Hydro advises consumers to obtain written service-agreement details, including the work, cost, coverage limits and any priority-service benefit. Commercial owners should apply the same discipline while also reviewing their lease and procurement requirements with the appropriate advisers.
Comparing maintenance proposals?
We can inventory the equipment and prepare a property-specific maintenance scope with clear tasks, records and exclusions for review.
Request Commercial ServiceFrequently Asked Questions
Are commercial HVAC repairs included in a maintenance agreement?
Only when the written agreement says so. Many programs include planned inspection and maintenance while corrective repairs, parts and after-hours labour are quoted separately.
How many maintenance visits should a commercial building have?
The equipment, runtime, environment, manufacturer requirements and operational risk determine frequency. Seasonal visits are common, while some assets need more frequent attention.
Does priority service guarantee an arrival time?
Not necessarily. The agreement should define whether priority changes queue position, availability or a specific response commitment.
Should filters and belts be included?
They may be included or billed as used. Confirm sizes, quantities, labour, storage and whether unusual media or upgrades cost extra.
What report should an owner receive?
A useful report identifies each asset, tasks completed, relevant readings, deficiencies, photos where helpful, recommendations and unresolved work.
